Skip to the number
YardsNeeded

Deck beam span calculator: how far can a deck beam span between posts?

9 ft 0 in

maximum beam span, 2-ply 2 × 10 · effective joist span 12 × 0.66 = 7.92 ft, read in the 8 ft column · for 2-ply 2 × 10 Southern pine, 12 ft joists, IRC R507.5

Run your own numbers

Enter it the way you measured it: 4.5, 4 1/2, 3/8 or 10' 6".

9 ft 0 in

maximum beam span, 2-ply 2 × 10 · effective joist span 12 × 0.66 = 7.92 ft, read in the 8 ft column

    Source: IRC 2021 Tables R507.5(1) to R507.5(5), Maximum Deck Beam Span and Joist Span Factors (International Code Council), read October 17, 2026. Read the source

    A 2-ply 2 × 10 Southern pine deck beam carrying 12 ft joists with no overhang can span 9 ft 0 in between posts under a 40 psf live load (IRC 2021 Table R507.5(1), at 7.92 ft of effective joist span).

    A worked example

    A 3-ply 2 × 12 hem-fir beam under 13 ft joists that overhang it by 2 ft, with a 60 psf ground snow load needs 9 ft 4 in. The overhang is 2 ÷ 13 = 0.15 of the joist span, which takes the 1/6 row of Table R507.5(5), factor 0.90: 13 × 0.90 = 11.7 ft of effective joist span, read in the 12 ft column of Table R507.5(3).

    How far can a 2x10 deck beam span?

    It depends on the joists it carries, because the IRC reads the beam span against the effective joist span. A 2-ply 2 × 10 Southern pine beam under 12 ft joists with no overhang spans 9 ft 0 in at a 40 psf live load; a 3-ply 2 × 10 under the same joists spans 11 ft 2 in, and a single 2 × 10 spans 6 ft 0 in. Under 8 ft joists the 2-ply beam reaches 10 ft 4 in.

    What is the effective joist span?

    The joist span multiplied by a factor from IRC Table R507.5(5) that grows with the joist overhang past the beam: 0.66 with no overhang, 0.72 at 1/12 of the span, 0.80 at 1/10, 0.84 at 1/8, 0.90 at 1/6 and 1.00 at 1/4. An overhang loads the beam more, so the same beam spans less. The table prints the 1/12 row as “1/12 (0.87)”; 1/12 is 0.083, and the factor on that row is 0.72.

    What else it is called

    A deck beam span calculator is also searched as a deck beam span chart, deck beam span between posts or “how far can a 2x10 deck beam span”. A 2-ply beam is two boards nailed together face to face; the IRC table counts plies, so a doubled 2 × 10 is a 2-ply 2 × 10.

    The full IRC table

    IRC 2021 Tables R507.5(1) to (4), maximum deck beam span by load, species, beam and effective joist span
    Load · species · beam6 ft effective joist span8 ft effective joist span10 ft effective joist span12 ft effective joist span14 ft effective joist span16 ft effective joist span18 ft effective joist span
    40 psf live · Southern pine · 1-ply 2 × 6 4-74-03-73-33-02-102-8
    40 psf live · Southern pine · 1-ply 2 × 8 5-115-14-74-23-103-73-5
    40 psf live · Southern pine · 1-ply 2 × 10 7-06-05-54-114-74-34-0
    40 psf live · Southern pine · 1-ply 2 × 12 8-37-16-45-105-55-04-9
    40 psf live · Southern pine · 2-ply 2 × 6 6-115-115-44-104-64-34-0
    40 psf live · Southern pine · 2-ply 2 × 8 8-97-76-96-25-95-45-0
    40 psf live · Southern pine · 2-ply 2 × 10 10-49-08-07-46-96-46-0
    40 psf live · Southern pine · 2-ply 2 × 12 12-210-79-58-78-07-57-0
    40 psf live · Southern pine · 3-ply 2 × 6 8-67-56-86-15-85-34-11
    40 psf live · Southern pine · 3-ply 2 × 8 10-119-68-67-97-26-86-4
    40 psf live · Southern pine · 3-ply 2 × 10 13-011-210-09-28-67-117-6
    40 psf live · Southern pine · 3-ply 2 × 12 15-313-311-1010-910-09-48-10
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 6 4-13-63-02-82-52-32-1
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 8 5-64-84-03-63-22-112-9
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 10 6-85-105-14-64-13-93-6
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 12 7-96-96-05-65-03-93-6
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 6 6-15-34-94-43-113-73-3
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 8 8-27-16-45-95-24-84-4
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 10 10-08-77-97-06-66-05-6
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 12 11-710-08-118-27-77-16-8
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 6 7-86-86-05-65-14-94-6
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 8 10-38-107-117-36-86-35-11
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 10 12-610-109-88-108-27-87-2
    40 psf live · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 12 14-612-711-310-39-68-118-5
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 6 4-23-73-12-92-62-32-2
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 8 5-44-74-13-73-33-02-10
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 10 6-65-75-04-74-23-103-7
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 12 7-66-65-105-44-114-74-4
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 6 6-25-44-104-54-03-83-4
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 8 7-106-106-15-75-24-104-5
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 10 9-78-47-56-96-35-105-6
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 12 11-19-88-77-107-36-106-5
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 6 7-86-96-05-65-14-94-6
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 8 9-108-67-76-116-56-05-8
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 10 12-010-59-48-67-107-46-11
    40 psf live · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 12 13-1112-110-99-109-18-68-1
    50 psf snow · Southern pine · 1-ply 2 × 6 4-63-113-63-22-112-92-7
    50 psf snow · Southern pine · 1-ply 2 × 8 5-94-114-54-03-93-63-3
    50 psf snow · Southern pine · 1-ply 2 × 10 6-95-105-34-94-54-23-11
    50 psf snow · Southern pine · 1-ply 2 × 12 8-06-116-25-85-34-114-7
    50 psf snow · Southern pine · 2-ply 2 × 6 6-85-95-24-94-44-13-10
    50 psf snow · Southern pine · 2-ply 2 × 8 8-67-46-76-05-75-24-11
    50 psf snow · Southern pine · 2-ply 2 × 10 10-18-97-107-16-76-25-10
    50 psf snow · Southern pine · 2-ply 2 × 12 11-1110-39-28-57-97-36-10
    50 psf snow · Southern pine · 3-ply 2 × 6 7-117-26-65-115-65-14-10
    50 psf snow · Southern pine · 3-ply 2 × 8 10-59-38-37-66-116-66-2
    50 psf snow · Southern pine · 3-ply 2 × 10 12-810-119-98-118-37-97-3
    50 psf snow · Southern pine · 3-ply 2 × 12 14-1112-1111-610-69-99-18-7
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 6 4-03-52-112-72-42-22-0
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 8 5-44-73-113-53-12-102-8
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 10 6-75-84-114-54-03-83-5
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 12 7-76-75-115-44-104-64-2
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 6 6-05-24-74-23-103-53-2
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 8 8-06-116-25-85-04-74-2
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 10 9-98-57-76-116-45-105-4
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 12 11-49-108-98-07-56-116-6
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 6 7-66-65-95-34-114-74-4
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 8 10-08-87-97-16-66-15-8
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 10 12-310-79-68-88-07-67-0
    50 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 12 14-312-411-010-19-48-98-3
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 6 4-13-63-02-82-52-32-1
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 8 5-24-64-03-63-22-112-9
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 10 6-45-64-114-64-13-93-6
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 12 7-46-45-85-24-104-64-3
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 6 6-15-34-84-43-113-63-3
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 8 7-86-85-115-55-04-84-3
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 10 9-58-27-36-86-25-95-5
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 12 10-119-58-57-87-26-86-3
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 6 7-16-55-115-55-04-84-5
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 8 9-48-47-56-106045-115-7
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 10 11-910-29-18-47-87-26-9
    50 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 12 13-811-1010-79-88-118-47-10
    60 psf snow · Southern pine · 1-ply 2 × 6 4-23-73-32-112-92-62-5
    60 psf snow · Southern pine · 1-ply 2 × 8 5-34-74-13-93-53-33-0
    60 psf snow · Southern pine · 1-ply 2 × 10 6-35-54-104-54-13-103-7
    60 psf snow · Southern pine · 1-ply 2 × 12 7-56-55-95-34-104-64-3
    60 psf snow · Southern pine · 2-ply 2 × 6 6-25-44-94-44-03-93-7
    60 psf snow · Southern pine · 2-ply 2 × 8 7-106-106-15-75-24-104-6
    60 psf snow · Southern pine · 2-ply 2 × 10 9-48-17-36-76-15-85-4
    60 psf snow · Southern pine · 2-ply 2 × 12 11-09-68-67-97-26-96-4
    60 psf snow · Southern pine · 3-ply 2 × 6 7-56-96-05-65-14-94-6
    60 psf snow · Southern pine · 3-ply 2 × 8 9-98-67-86-116-56-05-8
    60 psf snow · Southern pine · 3-ply 2 × 10 11-810-29-18-37-87-26-9
    60 psf snow · Southern pine · 3-ply 2 × 12 13-911-1110-89-99-08-57-11
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 6 3-83-12-82-42-22-01-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 8 5-04-13-63-12-102-72-5
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 10 6-15-24-64-03-73-43-2
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 12 7-16-15-54-104-54-13-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 6 5-64-94-33-103-53-12-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 8 7-56-55-95-04-64-13-9
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 10 9-07-107-06-45-95-24-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 12 10-69-18-17-56-106-45-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 6 6-116-05-44-114-64-23-10
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 8 9-38-07-26-66-15-65-0
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 10 11-49-108-98-07-56-116-5
    60 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 12 13-211-510-29-48-78-17-7
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 6 3-93-22-92-52-22-01-11
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 8 4-104-23-73-22-112-82-6
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 10 5-105-14-64-13-83-53-3
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 12 6-105-115-34-104-54-23-11
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 6 5-74-104-43-113-63-22-11
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 8 7-16-25-65-04-74-23-10
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 10 8-87-66-96-25-85-44-11
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 12 10-18-97-107-26-76-25-10
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 6 6-86-15-55-04-74-33-11
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 8 8-97-96-226-45-205-55-3
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 10 10-119-58-57-87-36-86-3
    60 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 12 12-810-119-98-118-37-97-3
    70 psf snow · Southern pine · 1-ply 2 × 6 3-113-43-02-92-62-42-3
    70 psf snow · Southern pine · 1-ply 2 × 8 4-114-33-103-63-33-02-10
    70 psf snow · Southern pine · 1-ply 2 × 10 5-105-14-64-23-103-73-4
    70 psf snow · Southern pine · 1-ply 2 × 12 6-116-05-44-114-64-34-0
    70 psf snow · Southern pine · 2-ply 2 × 6 5-95-04-64-13-93-63-4
    70 psf snow · Southern pine · 2-ply 2 × 8 7-46-45-85-24-104-64-3
    70 psf snow · Southern pine · 2-ply 2 × 10 8-97-76-96-25-85-45-0
    70 psf snow · Southern pine · 2-ply 2 × 12 10-38-118-07-36-96-35-11
    70 psf snow · Southern pine · 3-ply 2 × 6 7-06-35-75-14-94-54-2
    70 psf snow · Southern pine · 3-ply 2 × 8 9-38-07-26-66-05-85-4
    70 psf snow · Southern pine · 3-ply 2 × 10 10-119-68-67-97-26-86-4
    70 psf snow · Southern pine · 3-ply 2 × 12 12-1111-210-09-18-57-117-5
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 6 3-52-102-52-22-01-101-9
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 8 4-73-83-22-102-72-52-4
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 10 5-84-94-13-83-43-12-11
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 1-ply 2 × 12 6-75-85-04-64-13-103-7
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 6 5-24-64-03-53-12-102-7
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 8 6-116-05-34-74-13-83-5
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 10 8-57-46-65-105-24-94-5
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 2-ply 2 × 12 9-108-67-76-116-45-95-4
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 6 6-65-75-04-74-23-93-5
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 8 8-87-66-86-15-65-04-7
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 10 10-79-28-27-66-116-45-10
    70 psf snow · Douglas fir-larch, hem-fir, spruce-pine-fir · 3-ply 2 × 12 12-410-89-78-98-17-77-1
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 6 3-62-112-62-32-01-111-9
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 8 4-63-103-32-112-82-62-4
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 10 5-64-94-23-93-53-23-0
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 1-ply 2 × 12 6-45-64-114-64-23-113-8
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 6 5-34-74-13-63-22-112-8
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 8 6-85-95-24-84-23-103-6
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 10 8-27-16-45-95-44-104-6
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 2-ply 2 × 12 9-58-27-46-86-25-95-5
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 6 6-45-85-14-84-33-103-6
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 8 8-47-36-55-115-55-14-8
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 10 10-28-107-117-26-86-35-11
    70 psf snow · Redwood, western cedars, ponderosa pine, red pine · 3-ply 2 × 12 11-1010-39-28-47-97-36-10

    IRC 2021 Tables R507.5(1) to R507.5(4), Maximum Deck Beam Span, as printed: feet-inches (9-0 is 9 ft 0 in). Effective joist span = actual joist span × the Table R507.5(5) factor for overhang ÷ span: 0 (no cantilever) → 0.66; 1/12 (0.87) → 0.72; 1/10 (0.10) → 0.80; 1/8 (0.125) → 0.84; 1/6 (0.167) → 0.90; 1/4 (0.250) → 1.00. Interpolation permitted. Extrapolation not permitted. Dead load = 10 psf, L/Δ = 360 at main span, L/Δ = 180 at cantilever. Snow load is not assumed to be concurrent with live load. No. 2 grade, wet service factor included. Beam cantilevers are limited to the adjacent beam's span divided by 4. Three redwood 3-ply 2 × 8 cells are printed as “604” (50 psf, 14 ft) and “6-22” and “5-20” (60 psf, 10 and 14 ft), which are not spans; the calculator skips them.

    Where the numbers come from

    The beam span is the distance between posts. A beam can run past its end post by at most a quarter of that span, and its depth must be at least the joists' depth where they hang flush from it. Glulam and LVL beams carry their maker's tables, and a hot tub or a roof over the deck is an engineered load. Your state or county adopts a version of the IRC and can amend the tables.

    By · Last updated . How this site is made.

    Other materials

    Embed this calculator

    Free to use on your own site. Copy the code and keep the credit line.

    Open the full calculator on YardsNeeded ↗